Tuesday 27 June 2017

WBCSD/CSI Progress Review

Description 2007 2008 2009 2010
Climate change
Total direct CO2 emissions(1) (gross),
metric tons(2)
10.3 million 11 million 8.7 million 10.1 million
Total direct CO2 emissions(1) (net),
metric tons(2)
10.3 million 11 million 8.7 million 10.1 million
Direct CO2 emissions((1) (gross), kg
per metric ton of product
690.1 million 684.3 million 672.6 million 697.7 million
Direct CO2 emissions((1) (gross)
including ST Pro-Ash™ production
690.1 million 684.3 million 672.6 million 697.7 million
Direct CO2 emissions(1) (net), kg per
metric ton of product
690.1 million 684.3 million 672.6 million 697.7 million
Direct CO2 emissions(1) (net) including
ST Pro-Ash™ production
651.3 650.6 633.8 654.4
Alternative fuels and materials
Energy efficiency, kcal per kg of clinker 855.9 852.0 844.4 843.9
Alternative fuel substitution for conventional
fuels, %
1.37 1.07 1.53 1.43
Biomass in kiln fuel, % 0.8 0.6 0.9 0.9
Alternative raw materials (clinker & cement), % 7.1 6.8 7 5.3
Clinker to cement ratio 0.8 0.8 0.82 0.84
Emissions
Total dust particulates, metric tons 928 1.268 1.493 1.866
Dust particulates, g per ton of clinker 85.1 108.8 142.5 153.6
Total NOx, metric tons 19,106 20,979 20,767 22,561
NOx, g per tonne of clinker 1,752 1,799 1,982 1,857
Total SOx, metric tons 3,263 3,356 2,456 2,567
SOx, g per tonne of clinker 299.1 287.8 234.4 211.3
Clinker produced with monitoring of major
and minor emissions, %
100 100 100 100
Local impacts
Active quarry sites with biodiversity issues(3,5) 3 3 3 5
Active quarry sites with biodiversity
management plans(4,5)
0 0 1 2
Active quarry sites with biodiversity
management plans(4,5), %
0 0 33 40
Sites with quarry rehabilitation plans(5), % 79 79 48 48
Health and Safety
Employee fatalities 0 0 0 0
Employee fatality rate 0 0 0 0
Contractor fatalities 1 3 0 0
Third-party fatalities 0 1 0 0
Employee lost time injuries 20 22 18 18
Employee lost time injuries Frequency Rate 2.85 3.26 2.81 2.49
Employee lost working days 964 718 714 1,234
Employee lost time injuries Severity Rate 137 106 111 171
Contractor lost time injuries 7 8 4 11

 
(1)
CO2 emissions before 2008 do not include emissions related to on-site vehicle and mobile equipment.
(2)Total emissions for the period 1990-2008 were recalculated in year 2009, according to WBCSD/CSI, to reflect changes in equity
held by TITAN Group (Egypt and Turkey).
(3) Active quarries within, containing or adjacent to areas designated for their high biodiversity value.
(4) Sites with high biodiversity value where biodiversity management plans are actively implemented.
(5) Refer to wholly owned active quarries that are attached to our cement plants (according to WBCSD/CSI).

Compare to Report 2009